Acorn Heat Works Checklist

Property Address
Date / Time
Area cleared of combustible materials:
Work area segregated with fire-resistant screens
Floors/surfaces protected (sand or non-combustible sheets)
Fire extinguisher present and checked
Heat transfer risks checked (other side of surfaces)

Risk Assessment

Is there a risk of fire or ignition?
Is a fire watch required?

Post-Work Requirements

I confirm that the area will be monitored for at least 1 hour after completion of works.

Declaration

I confirm that I have carried out the above checks and that all safety measures are in place before commencing hot works.
Clear Signature